This is the Islington Wharf update you have been waiting for

Double rainbow in Islington Wharf

For many years I have written about the problems at Islington Wharf. Part of the reason for writing about these flats is to force some change in my way, while others try other things. A lot of people don’t like its all out there for all to read but frankly its been out there for over a decade. The most important thing is to get the latent defects fixed to the comfort of all the people like myself who bought or are renting. Its been way too long!

Following on from this large post and the last post. Things have changed again…

The temporary aircon solution

…This time for last time hopefully

Waterside places came to the Islington Wharf committee with a proposal after the last one with Laing O’Rourke which was awful didn’t pass. It took some time but after the meeting in April, we were all ecstatic. The next day a email was to everybody

In short all the work which was planned with Laing O’Rourke would go ahead but with Morgan Sindall Construction. They will not use the garden as their workers yard instead use part of the old central retail park and phase 4 space, which is next door. They will do all the latent defect work in 18months instead of 2 years and the best part is they are going to replace all the glass, not stick a film to the outside. The cost of this all to the residents? Zero! Yes no cost. Lets be frank Islington Wharf has a ton of glass, so this is no cheap operation but was always needed. It would likely be easier if done years ago because now phase 2 & 3 makes access much more tricky.

Islington Wharf
Imagine replacing all that glass

Now you can see why we were ecstatic! This is a massive win and I find myself very fortune I am in the position where this is a option when so many flat owners are having to pay to replace their cladding.

The next part is to get agreement from all the flat owners they will allow access. As you can imagine with support from the committee and mailshots, emails, fb, etc. We have pretty much everybody in agreement. Although some haven’t replied back, likely forcing Waterside places to consider legal action to gain access.

Heat check while working
28c while working away with two fans and window wide open

This is most likely the last summer of heat (hopefully), which would be great as I’m experiencing 28c heat while working at home and its 24c outside.

Once things get going, I’ll start updating the older blogs as I do get the occasional press attention, which was the point of writing.

Update (Monday 14th June)

I was prompted to wrote this blog just after being interviewed by the Times journalist Emanuele. I had meant to write it for a long while but being interviewed pushed me to do, mainly to set the record straight and give a fair update of where we are now. I see the article went live in the Sunday Times thanks to a friend’s mum.

Although not quite what I said, its mainly there and glad the last part was included about the developer (Waterside places) agreeing to fix the latent defects.

Author: Ianforrester

Senior firestarter at BBC R&D, emergent technology expert and serial social geek event organiser. Can be found at cubicgarden@mas.to, cubicgarden@twit.social and cubicgarden@blacktwitter.io